About the Consultation
Wind2 are consulting on proposals for Parc Ynni Calon y Gwynt, as a Development of National Significance (DNS) comprising 11 wind turbines with a height to blade tip of up to 200m, a 40MW battery energy storage system (BESS), and associated infrastructure. We are inviting local communities, organisations and other interested parties to comment on the proposals prior to the submission of the planning application to Welsh Ministers.
The DNS process is used for certain types of nationally important infrastructure projects in Wales, including large renewable energy developments. Applications are submitted to the Welsh Ministers and are administered by Planning and Environment Decisions Wales (PEDW), rather than being determined by the local planning authority. While the decision of whether to grant planning permission is made by the Welsh Ministers, the views of local communities, local authorities, specialist consultees and other stakeholders are an important part of the process and will be carefully considered throughout the assessment.
What is Pre-Application Publicity and Consultation (PAC)?
Before submitting a DNS application, developers, such as Wind2, are required to undertake formal Pre-Application Publicity and Consultation (PAC). The purpose of PAC is to provide communities and consultees with an opportunity to understand the proposals, review the draft application documents and provide comments before the application is finalised.
This consultation is an important stage in the planning process. It enables us to explain the project, identify any issues or concerns that may not already have been considered, and, where appropriate, make changes to the proposals before they are submitted. We welcome comments from those with an interest in the project, whether you live nearby, represent a local organisation or simply wish to understand more about the proposals.
Consultation responses:
Anyone who wishes to make representations about this proposed development must write to:
Linden House, Mold Business Park, Wrexham Road, Mold, CH7 1XP
Alternatively, please send your representations via email to: calonygwynt@wind2.co.uk
All correspondence should quote the scheme name: Parc Ynni Calon Y Gwynt
Please respond by Monday 21st September 2026
How your feedback will be used?
The consultation will remain open for a minimum of 42 days, during which time all comments received will be recorded and reviewed by the Wind2 project team. Once the consultation has closed (21/09/2026), we will consider the feedback alongside the findings of our ongoing environmental and technical assessments.
Where appropriate, the proposals and supporting documents may be amended in response to the comments received. A Pre-application Publicity and Consultation (PAC) Report will then be prepared, summarising the feedback received and explaining how it has been considered. This report will accompany the final DNS application submitted to the Welsh Ministers.
Details of parties who provide responses to PAC will be submitted to PEDW along with the application PAC Report. This will enable PEDW to contact those who have responded if the application in question is Accepted for examination. Any comments provided in response to PAC will not prejudice your ability to make representations to the Welsh Ministers on any related DNS planning application. You should note that any comments submitted may be placed on the public file.
What Happens Next?
Following the conclusion of the PAC process and the subsequent finalisation of the application documents, the DNS application will be submitted to Planning and Environment Decisions Wales (PEDW); anticipated to take place in late 2026. If the DNS application is accepted, there will be an opportunity for members of the public and interested organisations to submit representations directly to PEDW, and participate in the examination process before a decision is made.
We encourage everyone with an interest in the project to review the documents available below, and to submit comments during the PAC period. Your feedback will help to inform the final proposals before the application is submitted.
Documentation:
Draft DNS Application Form & Document Schedule
Application for permission for a development of national significance draft
Parc Ynni Calon Y Gwynt Turbine Locations and Dimensions
PEDW Acceptance of Notification:
Acceptance of Notification NOTIFF003 2025 12 16
Site Notice:
Parc Ynni Calon Y Gwynt Site Notice English Cymraeg
Volume 1 - Non Technical Summary
Volume 2 - Environmental Statement
Vol 2 Chapter 2 Approach to EIA
Vol 2 Chapter 3 Scheme Need Alternatives and Iterative Design Process
Vol 2 Chapter 4 Description of the Proposed Development
Vol 2 Chapter 7 Landscape and Visual Impact Assessment
Vol 2 Chapter 8 Cultural Heritage
Vol 2 Chapter 10 Geology and Soils
Vol 2 Chapter 12 Traffic and Transport
Vol 2 Chapter 13 Shadow Flicker
Vol 2 Chapter 14 Aviation and Telecomms
Vol 2 Chapter 15 Cumulative Effects
Volume 3 - Appendices
Vol 3 Appendix 1 A EIA Scoping Report 1of5
Vol 3 Appendix 1 A EIA Scoping Report 2of5
Vol 3 Appendix 1 A EIA Scoping Report 3of5
Vol 3 Appendix 1 A EIA Scoping Report 4of5
Vol 3 Appendix 1 A EIA Scoping Report 5of5
Vol 3 Appendix 1 B EIA Scoping Direction
Vol 3 Appendix 2 A Carbon Balance
Vol 3 Appendix 4 A Battery Fire Safety Management Plan
Vol 3 Appendix 4 B High level Appraisal of Grid Connection
Vol 3 Appendix 5 A Main Site PEA 2026 1of4
Vol 3 Appendix 5 A Main Site PEA 2026 2of4
Vol 3 Appendix 5 A Main Site PEA 2026 3of4
Vol 3 Appendix 5 A Main Site PEA 2026 4of4
Vol 3 Appendix 5 B Access Road PEA 2026 1of5
Vol 3 Appendix 5 B Access Road PEA 2026 2of5
Vol 3 Appendix 5 B Access Road PEA 2026 3of5
Vol 3 Appendix 5 B Access Road PEA 2026 4of5
Vol 3 Appendix 5 B Access Road PEA 2026 5of5
Vol 3 Appendix 5 C Notable Habitats Report
Vol 3 Appendix 5 D Main Site Badger Report REDACTED
Vol 3 Appendix 5 E Access Road Badger Report
Vol 3 Appendix 5 F Main Site Aquatic Survey
Vol 3 Appendix 5 G Main Site Bat Activity Survey Report
Vol 3 Appendix 5 H Access Road GLTA Survey Report
Vol 3 Appendix 5 I GCN Survey Report
Vol 3 Appendix 5 J Reptile Report
Vol 3 Appendix 5 K Main Site Riparian Mammal
Vol 3 Appendix 5 L Access Road Riparian Mammal
Vol 3 Appendix 5 M Dormouse Report
Vol 3 Appendix 5 N HRA Screening Assessment
Vol 3 Appendix 5 O Outline Habitat Management Plan 1of5
Vol 3 Appendix 5 O Outline Habitat Management Plan 2of5
Vol 3 Appendix 5 O Outline Habitat Management Plan 3of5
Vol 3 Appendix 5 O Outline Habitat Management Plan 4of5
Vol 3 Appendix 5 O Outline Habitat Management Plan 5of5
Vol 3 Appendix 5 P Biodiversity Scoping
Vol 3 Appendix 5 Q Arboricultural Desk Study
Vol 3 Appendix 6 B Year 1 Ornithology Report 2022 2023
Vol 3 Appendix 6 C Year 2 Ornithology Report 2023 2024 1of4
Vol 3 Appendix 6 C Year 2 Ornithology Report 2023 2024 2of4
Vol 3 Appendix 6 C Year 2 Ornithology Report 2023 2024 3of4
Vol 3 Appendix 6 C Year 2 Ornithology Report 2023 2024 4of4
Vol 3 Appendix 6 D Collision Risk Modelling
Vol 3 Appendix 7 A Methodology
Vol 3 Appendix 7 B LANDMAP Filtering Process
Vol 3 Appendix 7 C LANDMAP Baseline Descriptions and Sensitivity Assessment
Vol 3 Appendix 7 D LANDMAP GLAA Assessment
Vol 3 Appendix 7 E LANDMAP LHAA Assessment
Vol 3 Appendix 7 G LANDMAP HLAA Assessment
Vol 3 Appendix 7 H LANDMAP CLSAA Assessment
Vol 3 Appendix 7 I Assessment of effects Eryri National Park S Qs
Vol 3 Appendix 7 J Assessment of effects Proposed Glyndŵr National Park S Qs
Vol 3 Appendix 7 K Viewpoint Assessment
Vol 3 Appendix 7 L Residential Visual Amenity Assessment
Vol 3 Appendix 7 M Night time Assessment 1of9
Vol 3 Appendix 7 M Night time Assessment 2of9
Vol 3 Appendix 7 M Night time Assessment 3of9
Vol 3 Appendix 7 M Night time Assessment 4of9
Vol 3 Appendix 7 M Night time Assessment 5of9
Vol 3 Appendix 7 M Night time Assessment 6of9
Vol 3 Appendix 7 M Night time Assessment 7of9
Vol 3 Appendix 7 M Night time Assessment 8of9
Vol 3 Appendix 7 M Night time Assessment 9of9
Vol 3 Appendix 8 A Baseline Appendix
Vol 3 Appendix 8 B Site Gazetteer
Vol 3 Appendix 8 C Stage 1 Scoping Exercise
Vol 3 Appendix 9 B Water Framework Directive
Vol 3 Appendix 10 A Baseline Soils Report
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 1of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 2of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 3of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 4of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 5of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 6of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 7of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 8of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 9of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 10of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 11of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 12of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 13of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 14of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 15of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 16of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 17of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 18of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 19of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 20of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 21of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 22of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 23of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 24of25
Vol 3 Appendix 10 B Geoenvironmental Preliminary Risk Assessment 25of25
Vol 3 Appendix 10 D Outline Soils and Peat Management Plan
Vol 3 Appendix 11 A Measurement Locations
Vol 3 Appendix 11 B Calibration Certificates
Vol 3 Appendix 11 C Time History Figures H3
Vol 3 Appendix 11 D Time History Figures Field Nr Lakeside View
Vol 3 Appendix 11 E Time History Figures H7
Vol 3 Appendix 11 F Time History Figures H47
Vol 3 Appendix 11 G Time History Figures H53
Vol 3 Appendix 11 H Time History Figures H56
Vol 3 Appendix 11 I Background Noise Regression Figures
Vol 3 Appendix 11 J Prediction Assumptions
Vol 3 Appendix 11 K Unrestricted Operation
Vol 3 Appendix 11 L Operational Modes
Vol 3 Appendix 11 M Assessment Figures
Vol 3 Appendix 11 N Cumulative Noise Prediction Assumptions
Vol 3 Appendix 11 O Cumulative Noise Assessment
Vol 3 Appendix 11 P BESS Noise Assessment
Vol 3 Appendix 11 Q Construction Noise Assessment
Vol 3 Appendix 12 A Outline P Ro WMP
Vol 3 Appendix 12 B Outline CTMP Issue
Vol 3 Appendix 12 C Route Survey Report
Vol 3 Appendix 12 D Indicative Construction Traffic Movements
Vol 3 Appendix 13 A Shadow Flicker Modelling Results
Vol 3 Appendix 14 A Reduced Lighting Scheme Proposal
Volume 4 - Figures
Figure 3 1 Indicative Wind Turbine
Figure 4 2 Indicative Wind Turbine Foundation
Figure 4 3 Indicative Wind Turbine Crane Hardstanding
Figure 4 4 Indicative Internal Site Track Cross Section
Figure 4 5 Indicative Culvert Detail
Figure 4 6 Indicative Bridge Plan and Elevation
Figure 4 7 Indicative Cable Trench Cross Section
Figure 4 8 Indicative Control Building and Substation Plan
Figure 4 9 Indicative Temporary Construction Compound
Figure 4 10 Indicative BESS Compound
Figure 4 11 Indicative Construction Programme
Figure 5 1 Designated sites of national importance within 2km of the Site
Figure 5 2 Non Statutory Designated Sites within 2 km of the Site
Figure 5 3 Parcels of Ancient Semi Natural Woodland within 2km of the Site
Figure 5 4 The Proposed Development overlain on the Phase 1 habitat map of the Site 1of2
Figure 5 4 The Proposed Development overlain on the Phase 1 habitat map of the Site 2of2
Figure 5 5 The Proposed Development overlain on Priority Habitats within the Site 1of2
Figure 5 5 The Proposed Development overlain on Priority Habitats within the Site 2of2
Figure 6 1 Site location Proposed Infrastructure and Designated Sites
Figure 6 3 Red Kite Flightlines Year 1 Breeding
Figure 6 4 Red Kite 2022 23 Year 1 non breeding
Figure 6 5 Red Kite Flightlines Year 2 breeding
Figure 6 6 Red Kite Flightlines Year 2 non breeding
Figure 6 7 Hen Harrier Flightlines Year 1 and Year 2
Figure 6 8 Hobby Peregrine and Short eared Owl Flightlines Year 1 and Year 2
Figure 6 9 Kestrel Flightlines Year 1
Figure 6 10 Kestrel Flightlines Year 2
Figure 6 11 Nightjar Territories
Figure 6 12 Wildfowl Flightlines Year 1 and Year 2
Figure 6 13 Golden Plover Flightlines Year 1 and Year 2
Figure 6 14 Curlew Flightlines Year 1 and Year 2
Figure 6 15 Curlew territories Year 1 and Year 2
Figure 6 16 Skylark registrations Year 1 and Year 2
Figure 7 1 Landscape and Visual Study Area
Figure 7 2 Zone of Theoretical Visibility ZTV to Blade Tip with Viewpoint Locations 20260421
Figure 7 3 Zone of Theoretical Visibility ZTV to Hub Height with Viewpoint Locations 20260421
Figure 7 6 National Landscape Character Areas with Zone of Theoretical Visibility ZTV to Blade Tip
Figure 7 9 Tranquillity and Place Visually Tranquil Areas 20260424
Figure 7 10 Settlements within 10km
Figure 7 11 Local Recreational Routes and Key Recreational Destinations within 10km 20260715
Figure 7 12 Cumulative Context
Figure 7 13 1 Cumulative ZTV Calon y Gwynt with Tirgwynt and Esgair Cwmowen 20260421
Figure 7 13 2 Cumulative ZTV Calon y Gwynt with Mynydd Clogau 20260421
Figure 7 13 3 Cumulative ZTV Calon y Gwynt with Carno I II and Carno III 20260427
Figure 7 13 4 Cumulative ZTV Calon y Gwynt with Llanbrynmair and Cemmaes 20260421
Figure 7 13 5 Cumulative ZTV Calon y Gwynt with Llandinam and Garn Fach 20260427
Figure 7 13 6 Cumulative ZTV Calon y Gwynt with Llyn Lort 20260421
Figure 7 14 Residential Properties within 2km Blade Tip ZTV 20260611
Figure 7 15 Residential Properties within 2km Hub Height ZTV 20260611
Figure 7 16a i Viewpoint 1 A470 Clatter looking north north east 1of2
Figure 7 16a i Viewpoint 1 A470 Clatter looking north north east 2of2
Figure 7 17a i Viewpoint 2 A470 Carno looking north east 1of2
Figure 7 17a i Viewpoint 2 A470 Carno looking north east 2of2
Figure 7 18a i Viewpoint 3 Cefn Coch looking south west 1of2
Figure 7 18a i Viewpoint 3 Cefn Coch looking south west 2of2
Figure 7 19a i Viewpoint 4 A470 East of Talerddig looking east looking east
Figure 7 20a i Viewpoint 5 Severn Way South of Bwlch Y Ffridd looking west 1of2
Figure 7 20a i Viewpoint 5 Severn Way South of Bwlch Y Ffridd looking west 2of2
Figure 7 21a i Viewpoint 6 B4569 Western Edge of Caersws looking north west 1of4
Figure 7 21a i Viewpoint 6 B4569 Western Edge of Caersws looking north west 2of4
Figure 7 21a i Viewpoint 6 B4569 Western Edge of Caersws looking north west 3of4
Figure 7 21a i Viewpoint 6 B4569 Western Edge of Caersws looking north west 4of4
Figure 7 22a i Viewpoint 7 Glyndwrs Way north of Moelddolwn looking south
Figure 7 23a i Viewpoint 8 Minor Road East of New Mills looking west
Figure 7 24a i Viewpoint 9 Llanidloes Road Newtown looking north west 1of2
Figure 7 24a i Viewpoint 9 Llanidloes Road Newtown looking north west 2of2
Figure 7 25a i Viewpoint 10 Sustrans NCR81 and Severn Way looking north
Figure 7 26a i Viewpoint 11 Glyndwrs Way North of Llanbrynmair looking south east
Figure 7 27a i Viewpoint 12 Cambrian Way west of Bont Dolgadfan looking east
Figure 7 28a i Viewpoint 13 B4395 North of Llangadfan looking south
Figure 7 29a i Viewpoint 14 Sustrans NCR8 West of Dylife
Figure 7 30a i Viewpoint 15 Y Golfa West of Welshpool looking south west
Figure 7 31a i Viewpoint 16 Glyndwrs Way Meifod looking south west
Figure 7 32a i Viewpoint 17 Offas Dyke National Trail north east of Montgomery looking west 1of2
Figure 7 32a i Viewpoint 17 Offas Dyke National Trail north east of Montgomery looking west 2of2
Figure 7 33a i Viewpoint 18 Black Mountain Shropshire Hills National Landscape looking north west
Figure 7 34a i Viewpoint 19 Cambrian Way Pumlumon Fawr looking north east
Figure 7 35a i Viewpoint 20 Maen Du Eyri National Park looking south east
Figure 8 1 Designated Historic Assets and ZTV
Figure 8 2 Non Designated Historic Assets
Figure 9 1 Hydrology Study Area
Figure 9 2 Topography Overview
Figure 9 4 Water Framework Directive Waterbodies
Figure 9 5 Flood Risk Overview
Figure 10 2 Superficial bedrock
Figure 10 3 Predominant Soils v2
Figure 10 4 Peatland of Wales POW
Figure 10 7 Geomorphology 1of4
Figure 10 7 Geomorphology 2of4
Figure 10 7 Geomorphology 3of4
Figure 10 7 Geomorphology 4of4
Figure 10 8 Aerial Imagery 1of3
Figure 10 8 Aerial Imagery 2of3
Figure 10 8 Aerial Imagery 3of3
Figure 10 9 Factor of Safety 1of2
Figure 10 9 Factor of Safety 2of2
Figure 10 10 Initial Likelihood 1of2
Figure 10 10 Initial Likelihood 2of2
Figure 10 11 PLHRA Receptors 1of2
Figure 10 11 PLHRA Receptors 2of2
Figure 10 13 Initial Risk 1of2
Figure 10 13 Initial Risk 2of2
Figure 10 14 Detailed Assessment Areas 1of4
Figure 10 14 Detailed Assessment Areas 2of4
Figure 10 14 Detailed Assessment Areas 3of4
Figure 10 14 Detailed Assessment Areas 4of4
Figure 10 15 Revised risk Zones of Interest 1of2
Figure 10 15 Revised risk Zones of Interest 2of2
Figure 11 2 Indicative Noise Contour
Figure 11 3 Cumulative Site Plan
Figure 11 4 BESS Noise Contours
Figure 11 5 Construction Noise
Figure 11 6 Predicted Construction Access Track Section 2
Figure 11 7 Predicted Construction Access Track Section 3
Figure 12 1 Traffic and Transport Study Area
Figure 12 2 Transport Network and Survey Locations Summary
Figure 12 3 Public Rights of Way Network Summary
Figure 13 1 Shadow Flicker Study Area and Receptors
Figure 13 2 Shadow Flicker Map
Volume 5 - Other Supporting Documents
Vol 5 Construction Environmental Management Plan
Vol 5 Green Infrastructure Statement 1of5
Vol 5 Green Infrastructure Statement 2of5
Vol 5 Green Infrastructure Statement 3of5
Vol 5 Green Infrastructure Statement 4of5
Vol 5 Green Infrastructure Statement 5of5
Vol 5 Planning Design and Access Statement 1of2
Vol 5 Planning Design and Access Statement 2of2